Easy Evening Ride 28 April 2004
Ignoring the likelihood of a shower or two, eight met up on the Green
Bridge for our first evening ride of the year yesterday. Ride leader
Steve was delayed with saddle trouble so Keith ably took over.
Off we went, down the canal to Limehouse Basin, east along the river
then Wapping's ornamental canal ending up at St Katharine's Dock. A
brief stop for shelter during a heavy shower and then it was back
along the cobbles of Wapping High Street and to the canal via
Limehouse Basin again. In the gloom we headed up to Victoria Park
and finished off with a relaxing ride along he blossom lined paths.
Then back down the canal, heading to the Morgan Arms for some well
earned liquid refreshment. Ride time about 1 3/4 hours, not sure of
the distance but that didn't matter, a good time was had by all.
Owen |
 down Regent's Canal
 along the ornamental canal
 zig-zagging up from the ornamental canal
 cruising round Victoria Park
 more cruising in Victoria Park
|